Skip to content
  • There are no suggestions because the search field is empty.

How to Use Roster Cost Forecasting

Roster cost forecasting gives you an award-based cost estimate for your rostered shifts — before employees clock in. Use it to plan staffing budgets and spot costly scheduling decisions early.

 

What It Does

  • Calculates predicted costs for each rostered shift based on your configured award rules
  • Breaks down forecasted hours and costs by category (ordinary, overtime, paid breaks, leave, and more)
  • Shows totals per day and across the full roster period
  • Updates automatically as you add, move, or remove shifts

Where to Find It

Open Roster from the main navigation. The Forecast summary appears at the top of the roster grid in both views:

  • Shift View — forecast totals are displayed per shift template column and across the full period
  • Employee View — forecast totals are displayed per employee and across the full period, with per-employee cost and hour summaries

In both views:

  • Total hours and total cost display in the summary row for each day and for the full period
  • Values are rounded — hours to whole numbers, costs to whole dollars
  • Cost figures are only visible if your account has Financial Details permission enabled

    Image 12-06-2026 at 11.00 AM

Viewing the Forecast Breakdown

Click the expand button (chevron arrow) to reveal a detailed breakdown. The expand button floats at the centre of the visible date columns and stays on screen as you scroll horizontally, so you can always reach it.
Image 10-06-2026 at 4.35 PM

When expanded, the breakdown is organised into two sections — Hours and Cost — each separated by a full-width horizontal rule. Detail rows appear directly beneath their section summary, making it easy to scan from top to bottom.

Image 10-06-2026 at 4.35 PM (1)

In the period summary column (left side), each row shows its category label with a left-aligned label and a right-aligned bold total. In the individual day columns, values are displayed without labels — each row lines up with the corresponding label on the left.

Hours Breakdown

 

Category

 

What It Means

 

Ordinary

Standard (normal time) hours

Overtime

Hours exceeding the ordinary threshold

Paid break

Break time that is paid

Leave

Hours attributed to approved leave

Min engagement

Extra hours added to meet minimum shift engagement requirements

Rate penalty

Hours associated with rate-based penalty conditions (shown for reference)

Currency penalty

Currency-based penalty units (shown for reference — not added to the hours total)

Allowance

Allowance units triggered (shown for reference — not added to the hours total)

 
 
 

Cost Breakdown

When Financial Details are enabled, you also see:

 

Category

 

What It Means

 

Ordinary

Cost of ordinary hours

Overtime

Cost of overtime hours

Paid break

Cost of paid break time

Leave

Cost of leave hours

Min engagement

Cost of minimum engagement top-ups

Rate penalty

Additional cost from rate-based penalties

Currency penalty

Additional cost from currency-based penalties

Allowance

Cost of triggered allowances

 
 
 

Day-by-Day View

The breakdown is available both at the period level (left column) and for each individual day in the roster grid. Expand the forecast row to compare costs across days — values are rounded to whole numbers so you can quickly scan and compare.

Employee View Forecasting

In the Employee View, forecasting works the same way with a few additions:

  • Each employee row shows their individual forecast hours and cost
  • The Forecast row aggregates totals across all visible employees
  • When you filter employees by department, the forecast totals update to reflect only the filtered employees
  • Forecast data loads in the background — you may briefly see a loading indicator while costs are being calculated

Tips

  • Forecast updates live — costs recalculate as you edit shifts
  • Compare days — use the expanded day-by-day breakdown to identify the most expensive days in a roster
  • Budget check — review the period total before publishing a roster to stay within labour budgets
  • Overtime visibility — spot overtime costs building up across the week before they happen
  • Filter to focus — use department filters in Employee View to see forecasted costs for a specific team